Tuesday, September 14, 2010

PHOTOS AND VIDEO FROM SEPTEMBER 4TH AND 10TH

Ron Wallace and his crew reset two poles and prepare for the concrete slab at the base of the tower.







Wednesday, July 21, 2010

TOWER CONSTRUCTION UPDATE

All four tower poles are now up, but not without a little trouble. A 12,000lb. granite boulder was in the way and needed to be dug out of the hole. VERY hard pan soils under the rock that were dug instead of drilled to set the last of the four poles.






















Tuesday, July 20, 2010

Tuesday, June 8, 2010

Pole Delivery

June 6, 2010 - Photos and Video
Pole Delivery for New Challenge Tower